Enter content here |
|
||||
CRD was asked by SATORP/Aramco, in affiliation with Evans, to undertake an ergonomic study to review an
existing control building floor plan and make recommendations on: console sizes, groupings,
spacings and all aspects of traffic flows, etc. within the control building. Within 4 weeks
of project start-up, CRD had initial recommendations for the basic arrangement of the console
groupings within the control room.
![]() ![]() ![]() Following preparation of CRD's control room layouts, the preferred console supplier (Evans) prepared several renderings for presentation to SATORP.
![]() ![]() |
||||
Enter supporting content here |